Confirm unit suitability
Dimensions, running condition and vehicle type need review before a method is selected.
PORT DECISION MAP / SARAWAK

DECISION MAP / 01
Dimensions, running condition and vehicle type need review before a method is selected.
RORO does not automatically mean door-to-door. The handover and collection points must be stated.
Schedules change. Use dates only after current operational confirmation.
ROUTE BRIEF / 02
HANDOVER GEOGRAPHY / 03



ROUTE FAQ / 04
Not necessarily. Availability must be checked against the terminal, vessel and current booking.
That depends on the operator acceptance and handling method for the route.
No. They are different operating methods; suitability depends on the unit and route.
ROUTE / WHATSAPP